Skip to content
River Logic

Case study · Consumer goods

$332K a week in savings by making fewer products at each plant

$332Ksaved per week

  • Consumer goods
  • Capacity

About

One of the largest snack-food manufacturers in North America, with over 20 plants, more than 100 processing lines, a few hundred packaging lines and around 200 retail and distribution destinations.

01

The company met less than 90% of demand for one of its most profitable product families. Two production steps limited supply. Plans came from gut feel and 20+ spreadsheets, and every plant made every product on the assumption that freight would cost more than specializing.

02

A validated financial and operational model of the whole chain, from supplier to distribution, drawing on existing systems. It balanced production capability, demand, cost of goods and transportation together.

03

The assumption was wrong. Cutting material and freight costs while running more changeovers was more profitable. Initial runs found $332K in cost savings per week, plus millions in opportunity cost from freed-up inventory, and more demand met with fewer production hours.

Customers and partners

  • Merck
  • PwC
  • Accenture
  • Microsoft
  • Gurobi
  • Kenvue
  • Georgia-Pacific
  • Bristol Myers Squibb
  • Tronox
  • ToolsGroup
  • ZS
  • McKee Foods
  • Philip Morris International
  • Yorkshire Water
  • Brookes
  • AlixPartners
  • Finstock
  • BMA
  • Tengler
  • Transnova
  • Cornerstone
  • Tarmac
  • Boise